LeadBlog
Charlotte backyard pavilion with pergola, outdoor fireplace and outdoor kitchen

Charlotte outdoor living — permit week is the window for lighting and fan wiring

Week-one Charlotte permits: a south Charlotte deck-lighting installer's route

Andre installs low-voltage deck, stair and pergola lighting across south Charlotte. He needs to show up the week the City of Charlotte building permit issues — while the framing is open and before the homeowner picks fixtures with someone else.

Cold dumps failed. Charlotte issued building permits (trailing 7 days) are the trigger.

What changed

He bought CltLead for $19. After Stripe, the CSVs were emailed directly from Armorlight: a 7-day and a 30-day file with permit type, project name, project address, ZIP, building cost, square footage and issue date.

That week

  • Mon: filtered the 7-day file (17 permits, issued Sep 21–25) to outdoor structures: a new deck in 28277, a rear deck replacement and expansion in 28270, a 21x13 deck rebuild in 28226, a 12x14 gazebo in 28273 and a patio pavilion in 28210.
  • Tue: the city data has no phone field, so he routed the five addresses by ZIP and left door hangers with a stair-light and post-cap quote.
  • Thu: flagged the pavilion and gazebo for a ceiling-fan + string-light package, and put an ADU-above-garage permit in 28205 on his follow-up list.

Illustrative scenario: Andre is a composite operator, not a named customer. The permit counts and project types come from a real CltLead 7-day file.

Armorlight Enterprises, LLC is not affiliated with the City of Charlotte or Mecklenburg County.

Buy CltLead $19

CSV emailed directly from Armorlight after Stripe.

Buy $19 CltLead